Construction Updates
As on 3rd June 2017
Block 1 railing installed at roof top
Block 1 fire fighting system operational
Block 1 fire fighting system was operational..
Block 1 Lift installed
 
Block 1 lobby at 7th floor
Block 1 Lobby done and electrical duct..
Block 1 Lobby done upto 7th floor
Block 1 Main Stair Case
 
Block 1 railing installed
 
Block 1 railing installed at top floor
Block 1 Stair case from ground floor done...
Block 1
 
Block 2 fire exit root done on all...
Block 2 fire exit root stair case done...
Block 2 front elevation
Block 2 Lift installed and operational also
Block 2 looby done upto 7th floor
Block 2 main stair case done...
Block 2
 
Block 3 external view
 
Block 3 fire fighting system installed and ready
Block 3 lift installed
 
Block 3 lobby done upto 7th floor
 
Block 3 Staircase done till 7th floor...
 
Block 3 Staircase done till 7th floor...
Block 3
 
Block 4 Front view
 
Block 4 inside flooring done
Block 4
 
Block 5 front view
 
Block 5 inside flooring done
Block 5 inside flooring of the flat completed
block 5 kitchen flooring and counter top done
Block 5 lift installation going on
Block 5 view from the room
Block 5
 
Block 5
 
Block 6
 
Block 6 fire exist root done on all the floors
Block 6 internal finishing
 
Block 6 lobby done upto 9th floor
Block 6 Staircase done along with railing on all..
Block 7
 
Block 7 Eletrical duct casing done
block 7 elevation
Block 7 external elevation
Block 7 fire fighting system done
Block 7 Lobby done till 7th floor
Block 7 Lobby done upto 7th floor
Club and swimming pool area
Club and swimming pool
 
Club Area
 
Internal road base foundation done paber..
Internal road between block 6 & 7
Internal road front of Block 1 & 2
Internal road near block 6 & 2
Internal road
 
Landscape garden work started
Main gate work is going on
 
Main road view
 
Main road
 
Meter Kiosk installed on the ground floor...
Swimming pool and landscape garden
Transformer installed
 
Water treatment Plant and Swerages...
As on 11th January 2016
Drive way completion in front of Block 3
Drive way in front of Block 4 W-I-P
Drive way internal in front of Block 7
Drive way W-I-P in front of Block 1 & 2
Internal road WIP between block 1 and 2
Internal road work in progress...
Swimming pool and ampitheatre on progress
Swimming pool on progress
Water Treatment Plant
WIP between Block 1 & 6
Work in Progress between Block 4 & 5
As on 9th December 2016
Block-I
Block-II
Block-IV
Block-V
Block-VI
Block-VII
Main Gate
Swimming Pool Foundation work in progress
As on 9th November 2016
Block 2
Block 3
Block 4
Block 5
Block 6
Block 7
Internal Main road work on progress...
Internal road between Block 7 and 6 ...
The main road work which is on progress...
The main road work which is on progress...
As on 21st September 2016
Apmithetare & Mulitpurpose court
Block 3 Kichen counter
Block 1 flooring completed
Block 1 lift installation on Progress
Block 1 staircase ready
Block 2 Staircase completed
Block 3 Toilet upto 3rd floor completed
Block 4 Flooring completed
Block 5 Flooring completed
Block 6 flooring completed
Block 6 Kitchen completed
Transformer installation completed
As on 11th August 2016
Block 7 flat on 1st floor 1D
Block 7 1st floor lobby
Block 7 Lobby
Block 6 upto 4th floor kitchen and Toilet Completed...
Block 4 upto 4th floor bedroom living dining completed
Block 3 3rd floor kithcen & toilet works completed...
Block 2 upto 5th floor kitchen and toilet flooring work comleted...
Block 2 upto 5th floor kitchen and toilet flooring work comleted...
Block 1 upto 7th floor inside works on Kitchen...
As on 5th July 2016
Block 1 upto 7th floor internal flooring...
Block 2 internal flooring completed upto 4th floor
Block 3 internal flooring and tiles work...
Block 4 upto floor flooring done
Block 6 flooring done upto 4th floor
Block 7 front elevation done and inside upto...
Block 7 upto 4th floor all flooring done
Main gate and calvart work is on progress
As on 2nd June 2016
Block 1 inside finishing work is going on .
Block 2 Inside flooring done others finishing work is going on.
Block 2 Inside flooring done upto 7th floor other finishing work is going on .
Block 3 Flooring done and rest finishing work is on Progress .
Block 4 inside plaster done and flooring work is going .
Block 5 external Plaster Work on Progress .
block 7 exterior elevation color done .
Block 7 front phase after snowcem done .
Block 7 lift ready .
Block 7 Lobby done.
As on 11th May 2016
BL-1 east face
BL-1 south face
BL-2 north face
BL-2 north west face
As on 8th April 2016
BL-7 west view
BL-7 east view
BL-7 north view
Gate view
site view
Site view from Jeevandeep
Site view from road
BL-6 north view
BL-6 west view
Clubbing view
BL-4 & 5 view west side
BL-4 & 5 view east side
BL-3 south view
BL-3 north view
Site view
BL-2 & 3 south view
View of Nishita from BL-5 roof
As on 9th Feb 2016
Block1
Block2
Block3
Block4
Block5
Block6
Block7
As on 30th Dec 2015
Block1
Block2
Block3
Block4
Block5
Block6
Block7